Municipalities, road maintenance teams and applicators
Road and urban markings
Product selection for lines, directions and markings starts with the project specification and site conditions.

EXPLORE THE AREA

Guide the flow with lines.
Assess broken and continuous lane lines against the marking plan. Line length, width and substrate type are the starting points for product and quantity selection.
BEFORE YOUR PROJECT
Describe your road project in four steps.
Share the following information to help us recommend a product.
Screed and profiled markings use different products. Select the application method with the specification and equipment.
01Is the road surface asphalt or concrete?
Is the surface new or previously painted? Share the paint type or a photograph if a coating exists.
02Which markings are required?
Specify lane lines, edge lines, directional arrows or pedestrian crossings. Include a marking plan if available.
03How much area or line will be painted?
Provide line length and width, symbol quantities and dimensions, and required colours.
04Are the specification and schedule confirmed?
Share any project specification, equipment, delivery location and target date.




